Sök:

Sökresultat:

3104 Uppsatser om Building construction - Sida 1 av 207

Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling

The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Inneluftsventileradekryprumsgrunder : en utvärdering av två tillverkare

This Diploma work investigates internal air ventilated crawl-space in respect to construction and damp. The Diploma work assumes from a general description of crawl-space and general dump problems in ground construction. An internal air ventilated crawl-space is a construction where you take the ventilation air from the building and bring it down to the crawl-space and lets the air circulate before it passes through a retaining aggregate on the way out from the crawl-space. In this matter you get a worm space under the building and a lot less dump problems in form of · Ground damp · Build damp The ground dump reduces through draining around the building, different layer of gravel between the ground and the building and ventilation of the crawl- space. The build dump reduces through ventilation of the crawl-space as fast as possible.

Kartläggning av energianvändning under byggfasen vid nyproduktion av flerbostadshus

The energy consumption in the sectors of residential and public buildings is 40 % of the total energy consumption in Sweden. The main part, 85 %, of the energy use in these sectors is for operation of the buildings. The rest is used in the building process. When energy-efficiency measures are taken the energy use during the operation time decreases and the fraction of energy consumption during the building time increases. This project is carried out in cooperation with JM AB and concerns the energy use during the building time of production of blocks of flats at the building site.The main part of the electricity that is used during the production of apartment buildings goes into the heating of portacabins and illumination of the building during the construction phase.

iPad på en byggarbetsplats : Det effektiva och papperslösa sättet att arbeta på

Quality assurance of construction projects and create effective ways of working, is intoday's pressed position, major objectives for building contractor companies. This thesis is an attempt to see if it is possible to achieve these goals with the new modern tool iPad.The author of this thesis has during the latter half of his one year practice work in Uppsala for the Swedish Building construction company NCC Construction Sverige AB, conducted a study on the possibility of using the iPad on an construction site. This has been done with active field studies in which applications have been tested and also the supervisors receptive. The usability of the iPad has always been in focus since it is important that the applications are easy to use and easy to learn.The results of the work, as presented in this report, points at opportunities in efficiency if the iPad is introduced and used on construction site. There are many useful applications for the iPad, and with a system that can handle the synchronization between the iPad and the computer, the workflow will be streamlined significantly..

Byggnationsskillnader i Sverige, Finland och Tyskland

This paper is written as an examination paper at the University of Jönköping. The subject is chosen by Peab Sweden in Jönköping with whom further cooperation has been hold. The aim is to compare building methods and building materials in Sweden, Finland and Germany for further inspiration for Peab?s own market.BackgroundThe development of the construction industry develops new materials and methods to the market which has been forced by shorter construction times and the environment aspect. To pursue the development, further knowledge exchange should exist between the countries.

BIM Building Information Model : Hinder & Drivkraft

The  construction  industry  is  a  costly  business  such  in  respect  of  capital  for  most construction defects which then require rework, tear down and rebuild again. This study is  meaningful  awareness  of  tools  that  can  reduce  this  best  through  communication  and information sharing between the parties.  The  construction  industry  is  known  as  temporary  projects  organizations,  where  the construction  project  consists  of  several  actors  who  have  to  communicate  and  share information  between  them  to  avoid  mistakes  later  in  the  build  time.  These  actors  are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to  create  a  routine  for  the  association  and  the  shattering  of  these  actors.  To  implement such  behavior  using  a  tool  such  as  BIM  in  the  industry  whose  size  perhaps  is indescribable may be a very hard task.  BIM (Building Information Model) could be seen as the solution to this problem because it  acts  as  a  portal  where  the  actors  involved  must  sign  in  and  communicate,  share information, and eventually create a behavior, a routine for this association and division of  the  actors  following  the  end  of  the  project.  The  technology  could  help  the  involved from  the  beginning  of  the  project,  already  in  the  model  stage,  break  down  and  prevent any construction barriers when the building has been placed in the works.

Varbergs besökscentrum - Nybyggnation

This report deals with activities that from a CSR perspective are considered to create a shared value for a medium-sized construction company in Sweden. The CSR definition used in the report is the European Commission?s since it reflects the valuecreating aspects of CSR, in contrast to the traditional philanthropic aspect of CSR.Companies in the Building construction industry have difficulties identifying activities that create value in society and in the company. The aim with the project is to, from a CSR perspective, identify and evaluate value creating activities in a Building construction company. The activities will be evaluated with respect to competitiveness and how they can be implemented into an organization.

Café/Restaurang på Uddevalla Skeppsviken

This report deals with activities that from a CSR perspective are considered to create a shared value for a medium-sized construction company in Sweden. The CSR definition used in the report is the European Commission?s since it reflects the valuecreating aspects of CSR, in contrast to the traditional philanthropic aspect of CSR.Companies in the Building construction industry have difficulties identifying activities that create value in society and in the company. The aim with the project is to, from a CSR perspective, identify and evaluate value creating activities in a Building construction company. The activities will be evaluated with respect to competitiveness and how they can be implemented into an organization.

Hållbart ansvarstagande för ett medelstort byggföretag i Sverige - En analys av värdeskapande aktiviteter som bidrar till hållbar utveckling.

This report deals with activities that from a CSR perspective are considered to create a shared value for a medium-sized construction company in Sweden. The CSR definition used in the report is the European Commission?s since it reflects the valuecreating aspects of CSR, in contrast to the traditional philanthropic aspect of CSR.Companies in the Building construction industry have difficulties identifying activities that create value in society and in the company. The aim with the project is to, from a CSR perspective, identify and evaluate value creating activities in a Building construction company. The activities will be evaluated with respect to competitiveness and how they can be implemented into an organization.

Planering och val av metod i byggprojekt

This report describes the construction process and the aspects that should be taken into consideration. It includes models of decision and how these can be used in practice. Planning of a building project is very important for a successful execution. This will be the foundation of problems that will occur during the production. In the planning process people with different positions, search for the best suitable building methods.

Konstruktion av efterbehandlare

The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.

Framtagande av riktlinjer för arbetsplatsbesök enligt nya Plan- och bygglagen

A new site- and construction-law came into effect in May 2011. The new law, PBL2010:900 implies several different changes of the law. These changes concern bothconstructors, people working in municipality and county councils and other peoplethat in some way are related to the building sector. Except from the change in orderof the chapters and the renewed and modernized language, the law has now beenextended with a few new phases.According to the new law a certificate has to be issued to start and finish theconstruction; the construction consulting has changed name into technical consultingand the protocol for the controls has to show what the control is being compared to.This diploma work concerns control visits on construction sites as related to the newlaw. The reason why visits on construction sites are now implemented in the law isbecause the government saw a lack of trustworthiness in the old law.

Industriell produktion av loggia - en studie om loggiarum som alternativ till inglasad balkong

AbstractIntense competition in the building industry has forced building companies to develop highly efficient and optimised building solutions. This project, with a loggia that works both as an extended living room and a glazed balcony offers a highly economic viable alternative to standard balconies. This alternative is likely to attract build master since the area of the loggia will be part of the apartment area, i.e. included in the area for rent..

Fuktproblem i sydöstra Asien

The author has, with the help of AK Consultancy Indoor Air AB, formed a series of questions regarding moisture problems in buildings and how these are handled in extreme climates with high temperatures and a high relative humidity. Furthermore to analyse and indentify key material that makes a construction safe against moisture problems. Ventilation, AC and the choice of materials have in a later stage of the thesis been investigated to enhance the knowledge of moisture protection. The research for this report includes measurements on existing buildings, calculation models on the building envelope for analyses and the ingoing materials of the envelope. The health aspect of moisture problems related to ?sick building syndrome? has been included and interviews have been conducted to gather relevant information.A study of the American system, ASHRAE, American Society of Heating, Refrigeration and Air Conditioning Engineers and the standards used in Singapore has been made to highlight the difference.

1 Nästa sida ->